Case Study: TKE Engineering ensures environmental compliance on Boulder Avenue with Ultrasystems Environmental

A Ultrasystems Environmental Case Study

Preview of the TKE Engineering Case Study

TKE Engineering completes Boulder Avenue biological monitoring with Ultrasystems Environmental

Ultrasystems Environmental provided biological monitoring services for TKE Engineering on the Boulder Avenue Improvement Project in the City of Highland, CA. The challenge was to ensure the major roadway construction project complied with environmental regulations, particularly those protecting local species like the federally protected San Bernardino kangaroo rat and nesting birds during their breeding season.

The solution implemented by Ultrasystems included conducting regular environmental compliance inspections and nesting bird monitoring surveys throughout the construction period. They also prepared a comprehensive Environmental Compliance Report detailing their findings. This work ensured the project met all necessary environmental commitments and avoided potential hazards to protected wildlife, with Ultrasystems effectively managing the required biological monitoring.


View this case study…

Ultrasystems Environmental

48 Case Studies