Case Study: OnsiteIQ achieves 20% fewer project delays with Ultralytics YOLO11

A Ultralytics Case Study

Preview of the OnSiteIQ Case Study

OnSiteIQ reduces project delays by 20% with Ultralytics YOLO11

OnsiteIQ, a provider of construction intelligence, faced the challenge of limited visibility on large, complex job sites. This lack of a reliable, continuous record made it difficult to track progress, resolve disputes between stakeholders, and prevent costly project delays. To solve this, they turned to Ultralytics and implemented a solution powered by the YOLO11 segmentation model.

The solution involved using Ultralytics YOLO11 to create an AI pipeline that analyzes geolocated 360-degree imagery. This system detects construction progress, safety risks, and operational issues according to a proprietary ontology. The implementation by Ultralytics delivered significant results, including a 20% reduction in project delays, dispute resolution that was three times faster, and cost overrun savings of up to $400,000 per project for OnsiteIQ's customers.


View this case study…

Ultralytics

23 Case Studies