Case Study: InterEnergy improves BESS operations with TWAICE battery analytics

A TWAICE Case Study

Preview of the InterEnergy Case Study

Co-locating Solar and Storage Lessons from Operating a BESS for the First Time

InterEnergy, a leading energy company in Latin America and the Caribbean, faced challenges in operating its first large-scale Battery Energy Storage System (BESS), which was co-located with a solar plant. With a background in traditional generators, the team lacked insights into battery performance and degradation, leading to suboptimal operation and high troubleshooting costs. They sought a battery analytics solution from TWAICE to gain better visibility.

Implementing TWAICE's battery analytics software provided InterEnergy with detailed, actionable insights. The solution enabled real-time anomaly detection to cut downtime, improved battery health monitoring for warranty compliance, and uncovered underperforming components. For InterEnergy, TWAICE transformed BESS operations by providing the data needed for efficient management and paving the way for a unified renewable energy fleet.


View this case study…

InterEnergy

Laura Perez Amigo

Operations Manager


TWAICE

8 Case Studies