Turntide Technologies
14 Case Studies
A Turntide Technologies Case Study
Ivanhoé Cambridge, a global real estate company with CAD $69 billion in assets, sought scalable ways to cut energy use and meet ambitious targets (‑35% carbon intensity by 2025 and net‑zero by 2040) across a large portfolio of tenant‑driven shopping centers. After being introduced to Turntide Technologies, Ivanhoé Cambridge piloted Turntide’s Smart Motor System (with the Remote Monitoring Kit) to validate a low‑cost, vendor‑agnostic motor energy conservation measure.
Turntide Technologies deployed smart motors and remote monitoring at Vaughan Mills (Toronto) and CrossIron Mills (Calgary), delivering measured savings: Vaughan Mills — 38% RTU energy savings, 79% motor energy savings, ~32,844 kWh saved and 32,791 lbs CO2 avoided annually; CrossIron Mills — 35% RTU savings, 64% motor savings, ~21,801 kWh saved and 21,767 lbs CO2 avoided annually. The Turntide pilot demonstrated immediate ROI, real‑time performance validation, and a clear path to meaningful portfolio‑level carbon reductions.