TurboCAD
7 Case Studies
A TurboCAD Case Study
Leading Engineering Firm was awarded the contract to design and install the project's environmental heating and cooling systems. Facing tight schedules and strict budget constraints, they selected TurboCAD (TurboCAD Pro Platinum 2016) as their CAD solution to handle complex system designs while keeping implementation costs low.
Using TurboCAD, the firm produced detailed, professional designs efficiently, enabling them to stay on schedule and within budget. TurboCAD’s capability to manage project complexity economically delivered measurable results in meeting deadlines and controlling costs.
Leading Engineering Firm