LG&E and KU faced significant challenges in managing the construction of remote, greenfield substation sites. The projects were time-consuming to monitor through site visits and were vulnerable to theft, compounded by a lack of AC power infrastructure. To address this, they turned to vendor TrueLook for a solution using their construction cameras.
TrueLook implemented solar-powered cameras, enabling remote monitoring via live viewing and time-lapse documentation without needing grid power. This solution reduced the need for travel and provided critical security footage, which was successfully used to recover stolen equipment. LG&E and KU found that TrueLook's technology improved oversight, enhanced security, and provided valuable documentation for their complex substation projects.