Case Study: GE Power Systems achieves major travel cost savings and real-time remote inspections with TrueLook Construction Cameras

A TrueLook Construction Cameras Case Study

Preview of the GE Power Systems Case Study

GE Power Systems - Customer Case Study

GE Power Systems, a global leader in power plant construction, needed reliable visual access to remote installation sites so New York–based project leaders could record progress, support assessments and collaboration, and manage contract claims without frequent travel. To meet requirements for quick installation, industrial durability, ease of use and fast response, GE Power Systems selected TrueLook Construction Cameras’ telerobotic internet imaging system — weatherproof pan/tilt/zoom cameras with browser-based control, LIVEcard Project Archive and Scheduled Shot capabilities.

TrueLook Construction Cameras’ solution enabled remote inspections, simultaneous multi-user collaboration, time-stamped archived images and low-bandwidth high-resolution access, allowing GE Power Systems to run monthly web-based progress reviews, track deliveries and speed issue resolution without flying engineers to sites. The impact was measurable: thousands of dollars in travel avoided in the first months (one Greenville inspection saved $8,000), faster problem resolution, support for claims and damages assessments, and deployment of over 100 TrueLook systems worldwide.


Open case study document...

TrueLook Construction Cameras

16 Case Studies