Case Study: Precision Manufacturing Client achieves CMMC readiness and GCC High migration with TRNSFRM

A TRNSFRM Case Study

Preview of the Precision Manufacturing Client Case Study

Precision Manufacturing Client achieves CMMC readiness and migrates 100% of CUI to GCC High with TRNSFRM in under 12 months

Precision Manufacturing Client, an Ohio-based precision manufacturer, needed to achieve CMMC Level 2 certification to secure a new defense contract. Their existing IT environment, which included a flat network and legacy systems, was not compliant. They engaged the vendor TRNSFRM to rebuild their infrastructure and migrate to GCC High, all within a strict 12-month deadline and with a requirement for zero production downtime.

TRNSFRM executed an end-to-end transformation using their IT Resilience Framework. They built a new, segmented network with redundant systems, migrated all Controlled Unclassified Information (CUI) to GCC High, and managed a successful cutover to a new ERP system. The results included achieving CMMC readiness, completing the migration with zero production days lost, and enabling the client to unlock the new defense market opportunity on schedule.


View this case study…

TRNSFRM

3 Case Studies