The customer, a global asset management firm, faced the challenge of implementing efficient and future-proof technology for their new New York City headquarters, with a specific focus on sustainable and energy-efficient building practices. They engaged TRITECH Communications to help design these systems, which included navigating the technical challenges of new Power over Ethernet (PoE) lighting products.
TRITECH implemented a flexible, open Power over Ethernet lighting system. This IT-based, low-voltage solution allowed for daisy-chaining fixtures, which tripled the number of fixtures per port and cut installation costs in half. As a result, TRITECH helped the firm save two-thirds on power costs and realize additional savings through utility programs, all while creating a beautiful and green work environment.
A Global Asset Management Firm