Case Study: Transportation Corridor Agencies cuts planning time and environmental impact with Trimble Alignment Planning

A Trimble Case Study

Preview of the Transportation Corridor Agencies Case Study

Trimble Alignment Planning that protects the environment and cuts cost

The Transportation Corridor Agencies (TCA) faced a complex challenge while planning a 16-mile toll road in Southern California. After two years of using conventional CAD and GIS systems, TCA and its consultants were unable to develop a route that satisfied the multiple stakeholders and met all environmental and engineering requirements for the project.

Trimble implemented its Alignment Planning system, a unique methodology that allowed the team to simultaneously analyze environmental, community, engineering, and cost issues. For TCA, Trimble's solution saved an estimated 6-12 months in planning time and cut construction costs by over $80 million. The results also included dramatically reduced environmental impacts, such as cutting wetland disruption from 107 to 49 acres and reducing residential displacement from 32 homes to zero.


Open case study document...

Trimble

928 Case Studies