Case Study: Performance Contractors Inc. achieves faster, safer pipe installation with Trimble

A Trimble Case Study

Preview of the Performance Contractors Inc. Case Study

Performance Contractors reduces labor and rework costs by bringing vital info to the field

Performance Contractors Inc., a Gulf Coast industrial contractor, faced the challenge of laying out and installing 900,000 feet of pipe on a large petrochemical refinery expansion while improving speed, cost, and safety. To support the project, the team used Trimble solutions including Trimble Connect, Trimble Connect AR, Trimble Field Link, and scanning and layout tools to bring model and material information directly to the field.

Trimble helped Performance Contractors Inc. create a digital workflow that connected office and field teams in real time, reducing delays and improving coordination. The results included a 10-fold decrease in labor for the layout process, fewer change orders and rework, faster support installation, safer QA/QC, and more accurate tracking of the job, with real-time as-built data shared with the client.


View this case study…

Performance Contractors Inc.

Darby Milius

Performance Contractors Senior Field


Trimble

928 Case Studies