Leach & Russell Mechanical, a leading Indiana mechanical contractor working on the Community Hospital East project, needed to improve its BIM workflow, strengthen collaboration with other trades, and increase prefabrication of materials in a controlled environment before field assembly and installation.
They implemented Trimble SysQue, Trimble RTS873 and Trimble Field Link to centralize 3D models, add manufacturing-specific data and provide precise layout tools. Working from the same model enabled faster clash resolution, more accurate project plans, increased prefabrication, and 100% validated control points for reliable layout accuracy and quicker installation.