Case Study: Leach & Russell Mechanical achieves faster, highly accurate designs and installation with Trimble SysQue and Trimble Layout

A Trimble Case Study

Preview of the Leach & Russell Mechanical Case Study

Leach & Russell Mechanical Leverages Trimble SysQue and Trimble Layout Solution

Leach & Russell Mechanical, a leading Indiana mechanical contractor working on the Community Hospital East project, needed to improve its BIM workflow, strengthen collaboration with other trades, and increase prefabrication of materials in a controlled environment before field assembly and installation.

They implemented Trimble SysQue, Trimble RTS873 and Trimble Field Link to centralize 3D models, add manufacturing-specific data and provide precise layout tools. Working from the same model enabled faster clash resolution, more accurate project plans, increased prefabrication, and 100% validated control points for reliable layout accuracy and quicker installation.


Open case study document...

Leach & Russell Mechanical

Jason Kemp

CAD Designer and BIM Coordinator


Trimble

839 Case Studies