Case Study: Kalin Construction achieves precise, faster grading and improved rideability with Trimble technology

A Trimble Case Study

Preview of the Kalin Construction Case Study

Kalin Construction Uses Trimble Technology to Get Project Done Right

Kalin Construction was contracted for the earthwork on a six-mile reconstruction of I‑96 in Michigan, a high‑profile MDOT project with a tight deadline and $10,000/day liquidated damages. The scope included removing continuous‑reinforced concrete and asphalt, widening shoulders, undercutting and replacing a 12‑inch sand subbase, and moving large volumes of material in atypically wet conditions while meeting strict final‑grade tolerances.

Kalin deployed Trimble solutions — Terramodel 3D design, SPS880/882 rovers with TSC2 controllers, SPS730/930 total stations, and GCS900 grade control on dozers and motor graders — to cut surveying time, reduce staking and crew size, and provide automatic and indicated blade control. The technology enabled faster, more accurate grading (±1/2" on the sand base), efficient recycling of crushed concrete for drainage aggregate, improved rideability of the new concrete surface, and helped the team stay on schedule.


Open case study document...

Kalin Construction

Mark Bruzek

Project Manager