Trimble
839 Case Studies
A Trimble Case Study
Hunt Construction Group, a national leader in sports building founded in 1944, faced the challenge of replacing spreadsheets and paper processes to manage more than 100 projects a year and a $455M design‑build contract for the Arizona Cardinals Stadium on an aggressive schedule tied to the preseason opener. With 600 employees and $1.7B in annual revenues, Hunt needed a flexible system to standardize workflows, meet diverse owner reporting requirements, and accelerate project onboarding.
Hunt standardized on Prolog and Prolog WebSite for project management and collaboration, and integrated D5’s Encompass: Mobile and Encompass: Project Controls for wireless punch‑list collection and contractor coordination. Tablet-based data capture plus real‑time sync to Prolog streamlined inspections and corrective actions, significantly increasing punch‑list efficiency, reducing onboarding time, and helping deliver the stadium on schedule for the 2006 preseason—while enabling Hunt to scale without adding support staff.
Julie Meeker
Project Engineer