Case Study: Eiffage TP Group achieves 100% productivity gains on LGV Est high-speed rail project with Trimble 3D Machine Control

A Trimble Case Study

Preview of the Eiffage TP Group Case Study

Eiffage TP Group Realizes 100% Productivity Gains in LGV Est High-speed Rail Project with Trimble 3D Machine Control

Fougerolle Ballot Terrassements (Eiffage TP Group) was contracted to complete Lot 35 of the LGV Est Européenne high-speed rail line, a massive earthworks job that required moving about eight million cubic meters of material, building nearly 30 km of rail platform and meeting extremely tight precision tolerances of roughly 3 cm within a two-year window. The program involved over 120 machines and required both high production rates and centimeter-level accuracy to avoid costly material errors on a fixed-price contract.

The company implemented Trimble 3D machine control (GCS900), Trimble Business Center - HCE for 3D design/data prep, a network of five SPS852 base stations and in‑cab CB460 guidance across key machines. The result was dramatically higher efficiency and accuracy: bulldozers achieved 350 m²/hr (finish excavators 200 m²/hr), embankment grading capacity doubled (a 100% productivity gain), platform production rose to 10,000 m²/day versus ~6,000 without guidance, touch-ups and stakes were eliminated, material errors reduced, and operations were safer and faster. The team also adopted a solar-powered base station and plans to continue using Trimble solutions on future LGV projects.


Open case study document...

Eiffage TP Group

Frédéric Bourgault

Excavation Contractor and Director


Trimble

839 Case Studies