Case Study: Spotland achieves 50% faster, higher-quality 3D models and intersections with Trimble Business Center - HCE

A Trimble Case Study

Preview of the Spotland Case Study

Building Accurate 3D Models More Quickly with Business Center HCE

Spotland Copenhagen is a Denmark-based surveying and data-processing contractor that delivers 3D models for construction projects. Facing challenges building accurate, high-quality models for roadways, intersections and new developments—and wanting to reduce rework and improve jobsite data sharing—Spotland needed a faster, more connected modeling workflow for machine-control use.

Spotland adopted Trimble solutions including Business Center - HCE, Connected Community, total stations, rovers and GCS900 to centralize design data and deliver models directly to machines. The intersection tools and 3D workflows cut intersection modeling time from 2–3 days to about one day (a ~50% speedup), save roughly four hours per design revision on medium sites, reduce operator queries and rework, and deliver real-time models to machine control—producing faster, more accurate construction and cost savings.


Open case study document...

Spotland

Ingi Gudmundsson

BIM Engineer


Trimble

839 Case Studies