Case Study: Beilby Holdings achieves safer, more precise construction site control with Trimble Earthworks

A Trimble Case Study

Preview of the Bielby Holdings Case Study

Beilby Holdings Transforms Construction Sites with Trimble

Beilby Holdings, a construction group in southeast Queensland, faced the challenge of needing to complete a grading project without halting nearby traffic, making the traditional use of string lines unsafe. The company turned to Trimble, deploying its machine control technology to improve site safety and operational efficiency.

The solution from Trimble, including its Earthworks Grade Control Platform, enabled Beilby to operate no-peg sites with greater precision. The results included increased productivity, tighter tolerances, and virtually no rework. This adoption of Trimble technology has made the organization more competitive and has been praised by operators for its intuitive design and ability to improve job visualization.


Open case study document...

Bielby Holdings

Shannon Watson

Bielby Holdings


Trimble

928 Case Studies