ShoffnerKalthoff Mechanical Electrical Service was tasked with designing, prefabricating, and installing HVAC and plumbing for the University of Tennessee’s new eight‑story Strong Hall science building on a nine‑month schedule. With no on‑site material storage and a complex mix of mechanical systems, every component had to be built to exact measurements so prefabricated assemblies would fit and install immediately.
To meet this need they moved from a CAD‑based BIM platform to Trimble SysQue with Revit, enabling LOD 400 modeling, piping and plumbing spooling, and a streamlined BIM‑to‑prefab workflow. The change reduced field labor hours, increased productivity, improved the design‑to‑construction process, and allowed the team to deliver the project successfully.