Case Study: EvoEnergy achieves faster, more flexible electrical design for complex projects with Trimble MEP

A Trimble Case Study

Preview of the EvoEnergy Case Study

EvoEnergy uses Trimble MEP electrical design software to tackle major projects

EvoEnergy, a commercial renewable energy specialist, needed a better way to handle increasingly large and complex electrical projects as it expanded from solar PV into EV charging, battery storage, and related infrastructure. The company turned to Trimble’s electrical design software, including ProDesign, SingleCable, and Protect, to support its growing workload and more advanced engineering requirements.

Trimble implemented the Trimble Electrical Designer 2D subscription platform, giving EvoEnergy more flexibility, remote access, and features such as Arc Flash calculations. The software helped the team recreate existing networks quickly and accurately, streamline cable sizing, and catch design issues earlier, while Trimble training helped staff get more value from the tools.


View this case study…

EvoEnergy

Paul Lukehurst

Principal Engineer


Trimble

928 Case Studies