30% efficiency gain on football stadium construction

Martifer Construções faced the challenge of delivering the complex Arena Amazônia football stadium on a tight schedule, including twisted steel beams, precise material tracking, and coordinated pre-assembly and assembly work. To meet these demands, Martifer used Trimble’s Tekla software for 3D modeling, assembly and general arrangement drawings, and project coordination.

Trimble’s Tekla solution helped Martifer validate the structure, control geometric coordinates, and manage fabrication and logistics more efficiently. The result was a 30% increase in efficiency and a 20% productivity gain through Tekla Structures Open API and customizable reports and templates, helping Martifer adapt quickly to project changes and complete the stadium on time.