Busan Cinema Center Tekla's realistic simulation allowed for us to complete project with much less time and without errors

Daesung C.P Engineering faced a complex detailing challenge on the Busan Cinema Center project, especially with the landmark Big Roof and Double Cone structure, which required highly accurate modeling of unusual steel angles, camber, and cantilevered sections. The company used Trimble’s Tekla BIM software to create detailed shop drawings and manage the project’s structural complexity.

Trimble’s Tekla solution enabled realistic simulation, clash detection, and precise 3D modeling, helping Daesung reduce detailing errors, maintain consistency between model and drawings, and improve coordination during fabrication and erection. The result was a faster project completed with much less time, fewer errors, and measurable savings in time and money, while also improving work efficiency and accuracy.


View this case study…