Case Study: Flawless Steel achieves faster, more accurate steel fabrication with Trimble connected solutions

A Trimble Case Study

Preview of the Flawless Steel Case Study

How a champion of construction technology aims to lift the entire industry

Flawless Steel, an AISC-certified steel fabrication company in Denver, Colorado, faced the classic challenges of a paper-based construction workflow: slow estimating, error-prone detailing, and difficult production tracking. Seeking a better way to run its business, the company turned to Trimble technology, including Tekla Structures, Tekla PowerFab, and Trimble Connect.

With Trimble’s connected digital workflow, Flawless Steel streamlined estimating, BIM coordination, production control, and project collaboration. The result was fewer errors, better communication, faster project delivery, and improved accuracy—shaving weeks off timelines and, in one example, delivering anchor bolt submittals within two weeks on a Department of Energy project.


View this case study…

Flawless Steel

Victor Garcia

Chief Executive Officer


Trimble

928 Case Studies