Trimble
928 Case Studies
A Trimble Case Study
Flawless Steel, an AISC-certified steel fabrication company in Denver, Colorado, faced the classic challenges of a paper-based construction workflow: slow estimating, error-prone detailing, and difficult production tracking. Seeking a better way to run its business, the company turned to Trimble technology, including Tekla Structures, Tekla PowerFab, and Trimble Connect.
With Trimble’s connected digital workflow, Flawless Steel streamlined estimating, BIM coordination, production control, and project collaboration. The result was fewer errors, better communication, faster project delivery, and improved accuracy—shaving weeks off timelines and, in one example, delivering anchor bolt submittals within two weeks on a Department of Energy project.
Victor Garcia
Chief Executive Officer