Case Study: Texas Department of Transportation achieves optimized pavement maintenance and improved ROI with Trimble e-Builder

A Trimble e-Builder Case Study

Preview of the Texas Department of Transportation Case Study

Optimized Pavement Maintenance and Rehabilitation with AgileAssets® Pavement Analyst™

The Texas Department of Transportation (TxDOT), which manages more than 80,000 centerline miles of road across 25 districts and supports over 500 million daily vehicle miles traveled, needed to replace four standalone pavement applications with a single, modern pavement management system. The agency faced a tight migration timeline plus the need to build a new GIS module and train staff statewide while meeting goals to optimize maintenance and rehabilitation funding, standardize external reporting, enhance spatial reporting, and broaden system use.

TxDOT implemented AgileAssets Pavement Analyst as a SaaS solution, delivering an enterprise database, GIS integration, graphical reporting, visual project editing, and advanced multi-year, multi-constraint analytics that convert analysis into work plans. The new PMS lets TxDOT run and compare 4‑year scenarios to optimize funding, streamline workflows, standardize reporting to stakeholders, improve spatial analysis, and realize significant cost efficiencies (a conservative 1% saving equals about $20M/year), earning an industry honorable mention.


Open case study document...

Trimble e-Builder

71 Case Studies