Connect Plus Services manages and maintains London’s M25 under a 30-year, multi‑billion pound DBFO contract and needed an infrastructure asset management system to meet contractual performance targets. The challenge was large scale — some 150,000 assets (including 40,000 pavement sections, 3,000+ structural assets and 15,000+ tunnel M&E assets) — plus a hand‑back obligation to return assets in similar or better condition than a 2009 baseline, and the need to integrate with existing systems and train staff.
Connect Plus implemented AgileAssets® (Structures Analyst, Structures Inspector and Foundation) to provide a RMMS with inventory and inspection workflows, condition scoring, defect/work‑order management, live condition reporting, spatial search and multi‑constraint 1‑, 5‑ and 30‑year work planning. The solution integrated with legacy systems and mobile data collection, improved asset performance, mitigated lifecycle renewal risk, enabled optimized long‑term investment planning and delivered a 5% efficiency gain — approximately £48M saved over 30 years (£30M pavement, £18M structures) — plus a repeatable, auditable planning approach and industry recognition.