A European recycling equipment OEM faced the challenge of finalizing manufacturing designs for a recycling equipment project under extremely tight timelines to avoid costly penalties. They required Creo-compliant drawings, bills of materials, and coordination with their fabrication partner but lacked the internal engineering bandwidth. Treknocom was engaged to provide the necessary engineering support.
Treknocom deployed a team of engineers experienced in Creo and implemented a shift-based model to accelerate output. The team created detailed fabrication drawings and BOMs, conducted quality assurance, and collaborated daily with the client's team. As a result of Treknocom's solution, the project was delivered on time, avoiding any liquidated damages, and the client's internal team was freed to focus on other critical tasks.