Case Study: Willis-Knighton Medical Center achieves better comfort and energy efficiency with Trane chiller plant upgrades

A Trane Commercial Case Study

Preview of the Willis-Knighton Medical Center Case Study

Willis-Knighton Medical Center

Willis-Knighton Medical Center faced a challenge with its twenty-year-old chiller plant, which was taxed to capacity and lacked redundancy. The healthcare facility needed to upgrade its system to add capacity, improve comfort and humidity control, and reduce energy costs, all while minimizing disruption during construction. They partnered with Trane Commercial to implement a solution involving new chillers and controls.

Trane, along with partner Canariis Corporation, designed and built a custom, pre-packaged chiller plant featuring three new 1000-ton Trane CenTraVac chillers and a Tracer SC+ building automation system. This solution provided N+1 redundancy, improved efficiency with a 38°F chilled water supply for superior humidity control, and minimized on-site disruption. The results included enhanced comfort across the entire facility, the elimination of previous humidity issues, and successful audits with no environmental control concerns, all achieved without a prolonged construction outage.


View this case study…

Trane Commercial

350 Case Studies