Case Study: Tallahassee Single Day Surgery Center achieves better HVAC control and $135,000 in savings with Trane Commercial's CDQ system

A Trane Commercial Case Study

Preview of the Tallahassee Single Day Surgery Center Case Study

Tallahassee Single Day Surgery

Tallahassee Single Day Surgery Center faced significant challenges with its 14-year-old HVAC system, which struggled to control the extreme heat and humidity in Tallahassee, Florida. This made it difficult and expensive to meet strict surgical environment guidelines for temperature and humidity. Trane Commercial worked with the center to address these issues using its Cool Dry Quiet (CDQ) Desiccant Dehumidifier technology.

The solution implemented by Trane Commercial was a custom rooftop unit featuring the award-winning CDQ system, which was installed within ten days. This resulted in a system that runs with 20-25% greater efficiency than other dehumidification systems. The measurable impact was substantial, including over $135,000 in avoided costs for electrical upgrades and superior control of operating room conditions. Trane Commercial provided the surgery center with significant long-term savings and optimal performance.


View this case study…

Trane Commercial

350 Case Studies