Case Study: Le Meridien achieves energy savings and reliable guest comfort with Trane Commercial HVAC

A Trane Commercial Case Study

Preview of the Le Meridien Case Study

Le Meridien cuts HVAC energy use by 30% with Trane Commercial

The international five-star hotel Le Meridien in Bangalore needed to upgrade its aging 1985 HVAC system to improve energy efficiency, ensure reliability, and reduce service costs. They partnered with Trane Commercial, which proposed installing Series R helical rotary screw chillers.

Trane Commercial implemented its chillers and a Tracer Summit building automation system, leading to significant energy savings and optimal guest comfort. The initial chiller upgrade resulted in nearly 30% energy savings, and the automation system provided an additional 6-8% in savings. The solution ensured 24/7 reliability and allowed for precise control of the hotel's climate, achieving Le Meridien's goals for both efficiency and luxury.


View this case study…

Trane Commercial

265 Case Studies