The Georgia World Congress Center Authority faced the challenge of aging and inefficient HVAC and lighting systems across its large convention complex. Seeking to improve reliability, reduce long-term risk, and maintain its LEED certification, GWCCA partnered with Trane Commercial through an energy savings performance contract to modernize its facilities.
Trane implemented a comprehensive solution that centralized mechanical operations into a single plant with new high-efficiency chillers and boilers and upgraded over 50,000 lighting fixtures to LEDs. The project, managed by a Trane building automation system, resulted in a 39% reduction in energy use, saving over $2.5 million annually and 17 million gallons of water per year. Trane helped GWCCA achieve LEED Gold certification and provided significant operational cost savings.