Case Study: Edmonds Community College achieves $253,000 in annual energy savings with Trane Commercial

A Trane Commercial Case Study

Preview of the Edmonds Community College Case Study

Edmonds Community College - Customer Case Study

Edmonds Community College, a 22-building campus in Lynnwood, Washington, faced a tough combination of state budget cuts, rising utility costs, and aging equipment, including a boiler failure. To address its sustainability goals under the ACUPCC while improving comfort and staying within budget, the college worked with Trane Commercial on an energy efficiency project supported by an energy savings performance contract.

Trane Commercial helped implement a phased campus-wide solution that included HVAC and lighting upgrades, boiler replacement, chilled water and cooling tower optimization, server virtualization, direct digital controls, retro-commissioning, and active metering tied to an energy management system. The project delivered $253,000 in annual energy savings, $79,000 in annual operational savings from server virtualization, 1.4 million kWh in yearly savings, and a reduction of 3.9 million pounds of CO2 annually, with more than $2 million in utility incentives and grants helping fund the improvements.


Open case study document...

Edmonds Community College

Kevin McKay

Vice President Finance and Operations


Trane Commercial

265 Case Studies