The City of Bremerton Wastewater Treatment Plant faced the challenge of an outdated and inefficient primary effluent pump system that was at high risk of catastrophic failure. The aging equipment was costly to operate, harmful to the environment, and replacement parts were scarce. While the city needed to replace the system, it was also facing fiscal constraints. The city partnered with Trane Commercial through an Energy Savings Performance Contracting (ESPC) program to address this.
Trane Commercial implemented a solution to replace the entire pump system and controls. This project uncovered nearly $110,000 in annual operational revenue, secured a $500,000 grant and $315,000 in utility incentives, and produced a positive cash flow return in under six years. The solution greatly reduced the risk of system failure and realized significant electricity savings for the plant.