Timly
36 Case Studies
A Timly Case Study
Holzbau Bühlmann AG, a family-owned wood construction company from Mönthal, needed a better way to track tools, machines, and materials spread across multiple construction sites. Before using Timly, the team often did not know where equipment was located or who was using it, which led to unnecessary purchases, rising costs, and wasted time.
With Timly’s QR-code-based tool and material management system, Holzbau Bühlmann digitized its entire inventory, assigned construction sites as digital locations, and enabled mobile scanning for check-in, damage reporting, and maintenance requests. The result was full transparency over equipment and materials, faster inventory and on-site documentation, improved communication through notifications and photo uploads, and fewer unnecessary purchases, while Timly also helped manage employee certifications, maintenance schedules, and inspection deadlines.
Jan Keller
Foreman