Thornton Tomasetti was engaged by Aker Solutions Malaysia to protect the massive Gina Krog offshore production platform. The challenge was to ensure the structural safety and resilience of the $4.1-billion platform against diverse risks, including fire, blast, dropped objects, and ship impacts, to meet Norway's stringent safety standards and protect personnel.
Thornton Tomasetti implemented a comprehensive solution involving performance-based fire analysis, blast analysis, and computational fluid dynamics. Their work led to optimized passive fire protection, design revisions for strengthening critical structures like deck hatches, and a more cost-effective bridge design. As a result, Thornton Tomasetti ensured the platform's integrity for safe evacuation and prevented global structural collapse, safeguarding the major investment.