Case Study: WPM Construction achieves rental cost savings and streamlined finances & operations with Tenna

A Tenna Case Study

Preview of the WPM Construction Case Study

WPM Construction saved $25,000/month per fleet rental with Tenna

WPM Construction, a fourth‑generation, family‑owned civil site work and utility contractor in central Texas with a fleet of about 150 pieces of equipment, faced the limits of generic GPS telematics after 15+ years of use. They needed a construction‑focused system that could manage maintenance, finances (loans, depreciation, job costs), and integrate with their ERP (Viewpoint Vista) to eliminate redundant manual entry — so they turned to Tenna.

Tenna deployed its construction‑focused platform and GPS trackers (with in‑house installation support), integrated hours and utilization data directly into Viewpoint Vista, and added financial tools to track loans, depreciation and equipment performance. The result: clearer utilization visibility, reduced manual processes, and immediate cost savings — including avoiding an estimated $25,000/month in rental costs by redeploying underutilized excavators — demonstrating that Tenna paid for itself while enabling future growth.


Open case study document...

WPM Construction

Tre Leoni

Vice President


Tenna

30 Case Studies