Tenna
30 Case Studies
A Tenna Case Study
LEM Construction, a Houston-based general contractor with 50+ years building water and wastewater treatment plants, faced an unscalable, manual equipment-tracking process and a bad experience with a previous provider. They needed an equipment management solution that could deliver real-time fleet visibility and integrate with their Sage accounting system — a need Tenna addressed with its equipment management platform and tracking tools.
Tenna deployed its system to superintendents and mechanics, delivering asset location, utilization, fuel usage and idling alerts, automated preventive maintenance reminders, and job-cost reporting integrated into Sage. As a result Tenna “paid for itself already,” helped LEM substantially lower equipment costs by eliminating unnecessary rentals, enabled more accurate billing and financials, cut hours of manual reporting each month, and reduced field phone traffic.
Tex Anderson
Equipment Manager and Field Technician