Teletrac Navman
103 Case Studies
A Teletrac Navman Case Study
Southern Cross Group needed a better way to track the full lifecycle of its Pit Master towers and improve maintenance, compliance, and billing accuracy as it moved asset management to an on-site control room. To do this, it turned to Teletrac Navman asset tracking devices and supporting software integration to connect multiple systems into one platform.
Teletrac Navman helped Southern Cross Group build a bespoke solution that combined seven core applications into a single view of equipment movement, maintenance, productivity, and compliance. The result was improved visibility across the fleet, reduced human error, faster data entry for billing, and stronger support for maintenance scheduling and field operations, all backed by the location and uptime data from Teletrac Navman.
Sheldon Riddick
Group Operations Manager