Case Study: Energy Works Ltd. reduces speeding by 80% with Teletrac Navman

A Teletrac Navman Case Study

Preview of the Energy Works Ltd. Case Study

Energy Works Ltd. Puts Safety First & Reduces Speeding by 80%

Energy Works Ltd. needed better visibility and control over vehicles used during long maintenance shifts at power stations, where drivers could be working 12–14 hours and safety was a concern. The company turned to Teletrac Navman’s GPS fleet management solution to track vehicles and address speeding and private-use issues without relying on time-consuming logbooks.

Teletrac Navman implemented a unit in each vehicle, along with reporting tools for maintenance and compliance tracking. This helped Energy Works Ltd. monitor the fleet in real time, manage servicing and registrations more effectively, and improve driver behavior, cutting speeding by 80% while strengthening safety across the team.


View this case study…

Energy Works Ltd.

Travis McGrath

Chief Financial Officer


Teletrac Navman

103 Case Studies