Case Study: Werner Electric Supply achieves 99.9% accuracy and zero order backlog with Tecsys

A Tecsys Case Study

Preview of the Werner Electric Case Study

Werner Electric Supply Achieves 99.9% Accuracy and Zero Backlog with Tecsys

Werner Electric Supply is a regional electrical distributor (about 400 employees, 28,000 SKUs) serving contractors, industrial customers and MROs with tight, same‑day or next‑morning delivery windows. Its distribution operation faced the dual challenges of a high‑mix inventory (including complex wire‑cutting requirements and multiple units of measure), short fulfillment cycles and a lean IT team needing a system that could support value‑added services and rapid change.

Werner implemented Tecsys’ Itopia platform (WMS, TMS and analytics) integrated with Dematic automation and a multi‑level pick module, with custom logic for wire footage marking and shortest‑length selection. The result: 99.9% accuracy on wire cuts, zero order backlog at day’s end, elimination of a secondary packing step, 60–70% of picks handled through the pick module (roughly 3,000–3,500 of 5,000 daily lines) and the ability to make on‑the‑fly adjustments that support faster fulfillment and future growth.


Open case study document...

Werner Electric

Kyle Arndt

Value-Add Engineer


Tecsys

46 Case Studies