TechVertu
8 Case Studies
A TechVertu Case Study
TechVertu partnered with the John F Hunt Group, a construction company facing the challenge of providing reliable and consistent internet connectivity across its diverse operations. This included integrating both permanent offices and numerous temporary, often remote, construction sites into a single, seamless network, which was essential for maintaining uninterrupted operations and communications.
To solve this, TechVertu implemented a comprehensive solution featuring high-performance connectivity options, adaptive solutions for temporary sites, and SD-WAN integration using Cisco Meraki technology. This approach resulted in substantial cost savings, including up to 20% reduction in capital expenditures and up to 90% reduction in operational expenditures, while also enhancing operational efficiency and supporting the Group's sustainability goals.