Case Study: PS-Prototypenschmiede doubles productivity with Tebis and ProLeiS

A Tebis Case Study

Preview of the PS-Prototypenschmiede Case Study

PS-Prototypenschmiede doubles productivity and reaches 90% machine capacity with Tebis

PS-Prototypenschmiede, a small German prototype and pre-series parts manufacturer, faced a challenge in efficiently utilizing its high-end milling machines and automating its processes with its previous CAD/CAM system. The company's goal was to establish clear structures and standardized processes from the start to ensure success. To overcome these limitations, they implemented the Tebis CAD/CAM software along with the ProLeiS manufacturing control system.

The solution from Tebis completely modeled the company's entire automation process, featuring standardized NC programming templates, a virtual machine for simulation, and direct integration with ProLeiS for planning and control. This allowed PS-Prototypenschmiede to achieve a dramatic increase in efficiency. As a result, machine capacity utilization rose to 90 percent, and the time required for machining operations was cut in half, from six-to-eight weeks down to just three-to-four weeks, effectively doubling productivity.


View this case study…

Tebis

58 Case Studies