Tata Communications
88 Case Studies
A Tata Communications Case Study
Gammon Construction, a large civil engineering and infrastructure company, needed fast, reliable connectivity across remote project sites where telephony and network access were often unavailable. Before working with Tata Communications, project updates were delayed, drawings had to be transported physically, and poor coordination was causing time overruns and financial losses.
Tata Communications implemented a secure MPLS network with VSAT for last-mile redundancy, plus video conferencing across more than 100 project sites. The result was 24x7 connectivity, monthly financial closures, and much faster collaboration; Gammon reported about a 30% reduction in travel costs and collaboration across sites rising from 10% to 80%.
A.P. Kamath
Group Head-IT