Switch
1 Case Studies
A Switch Case Study
GoConference (WholesaleConference/GoConference), a toll‑free teleconferencing provider, faced the twin challenges of absolute reliability and reducing long‑distance voice costs to stay competitive. They colocated their teleconferencing equipment at Switch’s LAS VEGAS 2 data center and relied on Switch’s facility services and backup teleconference bridge to support their operations.
Switch delivered continuous availability—GoConference reports no facility-related downtime in 13 years—and fast recovery when on-site equipment failed, with Switch transferring calls to a backup bridge in under 30 minutes. Colocating with Switch in Nevada also produced significant long‑distance voice cost savings, helping GoConference remain competitive and win business against major telecom companies.
Herb Levitin
President