Case Study: Central Georgia EMC improves reliability and speeds restoration with SurvalentONE PSM

A Survalent Case Study

Preview of the Central Georgia EMC Case Study

Central Georgia EMC improves reliability with Survalent, managing 300 relays for 55,000 customers

Central Georgia EMC, a non-profit electric cooperative, sought to further protect its system from faults and reduce operational costs following a modernization initiative with Survalent. The utility wanted to improve network reliability and minimize outage times, leading them to implement Survalent's Protection Settings Manager (PSM) product.

The solution from Survalent automatically manages device behavior during events, simplifying operator workloads and completing restoration activities within seconds. By monitoring and controlling approximately 300 relays, SurvalentONE PSM has helped Central Georgia EMC improve reliability, productivity, and uptime, ensuring their network operates dependably and securely.


View this case study…

Survalent

46 Case Studies