Dubai Electricity & Water Authority powers 900 MW solar plant with Sungrow

The Dubai Electricity & Water Authority (DEWA) faced the challenge of building a massive 900 MW PV plant in the harsh desert conditions of Dubai, where extreme heat and sandstorms threatened equipment reliability. With a record-low feed-in tariff of 1.69 US cents/kWh, the project demanded a highly efficient and cost-effective solution. Vendor Sungrow provided its central inverters and medium voltage turnkey solutions to help meet these demanding requirements.

Sungrow's solution utilized a 6.25 MW block design with integrated inverters and MV stations to reduce initial investment and lower the levelized cost of energy. The system's efficient heat dissipation allowed for full-load operation in temperatures exceeding 50°C. The resulting plant now provides 2.268 billion kWh of clean power annually, enough for 270,000 homes, while reducing carbon emissions by 1.18 million tons.


View this case study…

Sungrow

45 Case Studies