Case Study: Bramley achieves record-fast 100 MW/331 MWh BESS commissioning with Sungrow PowerTitan 2.0

A Sungrow Case Study

Bramley reaches commercial operation in 2 weeks with Sungrow's 331 MWh BESS

Sungrow partnered with Bramley to deliver the Bramley 331 MWh BESS Project in the UK, a large-scale battery energy storage system requiring an exceptionally fast and reliable rollout to support grid flexibility.

Sungrow implemented its integrated PowerTitan 2.0 solution and a dedicated project team using closed-loop management and proactive simulations. This approach enabled the project to achieve commercial operation just two weeks after grid connection, which Sungrow states is about 72% faster than the industry average, setting a new benchmark for delivery speed in Europe.