Case Study: Turner Construction eliminates hoist double-bookings with StruxHub

A StruxHub Case Study

Preview of the Turner Construction Case Study

How Turner Gets 90% of Trades to Manage Their Own Deliveries Without Ever Double Booking its Hoists

Turner Construction faced significant challenges managing material deliveries and hoist scheduling for the Wexford Drexel Academic Tower project. Their previous system, a shared online calendar, led to trades frequently overwriting or deleting each other's bookings and double-booked critical resources, causing delays and complaints. The general contractor needed to regain control and implement a structured approval workflow.

By implementing StruxHub's construction delivery software, Turner introduced a structured booking system with an approval workflow. The solution enabled trades to reserve hoists with their deliveries, eliminating double-bookings. The result was a highly successful rollout, achieving 90% adoption where trades managed their own bookings, and delivery requests were made a median of 10 days in advance, giving the site back its predictability and control.


View this case study…

Turner Construction

Ryan Holzman

Assistant Superintendent


StruxHub

2 Case Studies