StruxHub
2 Case Studies
A StruxHub Case Study
Turner Construction faced significant challenges managing material deliveries and hoist scheduling for the Wexford Drexel Academic Tower project. Their previous system, a shared online calendar, led to trades frequently overwriting or deleting each other's bookings and double-booked critical resources, causing delays and complaints. The general contractor needed to regain control and implement a structured approval workflow.
By implementing StruxHub's construction delivery software, Turner introduced a structured booking system with an approval workflow. The solution enabled trades to reserve hoists with their deliveries, eliminating double-bookings. The result was a highly successful rollout, achieving 90% adoption where trades managed their own bookings, and delivery requests were made a median of 10 days in advance, giving the site back its predictability and control.
Ryan Holzman
Assistant Superintendent