A STRUMIS Case Study
Cleveland Bridge UK, a technology-based engineering, construction, and steel fabrication company, was contracted to fabricate and erect five steel bridges for Nottingham’s tramline extension. To manage the complexity of the project and support its zero-defects, on-time delivery culture, the company implemented STRUMIS, a steel fabrication management information system.
With STRUMIS, Cleveland Bridge UK was able to streamline information flow across estimating, procurement, production, dispatch, and site erection, improving material handling and project transparency. The project ran from mid-2012 to January 2014 and was delivered successfully, with Cleveland Bridge UK stating that STRUMIS provided the most complete and advanced features and proved indispensable in helping them deliver quality work on time and within budget.