Case Study: EvadX delivers the Summit Building on Mount Snowdon with STRUMIS

A STRUMIS Case Study

Preview of the EvadX Case Study

EvadX delivers the £9 million Summit Building with STRUMIS

EvadX, a UK-based steelwork fabricator, faced the significant challenge of fabricating and erecting the complex Summit Building on Mount Snowdon. The project involved the immense logistical difficulty of transporting over 100 tonnes of materials up a mountain via a small railway, a task further complicated by extreme weather conditions. To manage this, EvadX utilized the STRUMIS management information and fabrication system.

STRUMIS provided a complete fabrication information system that streamlined EvadX's workflow from detailing through to project management and fabrication. The system ensured precise control over material stock, procurement, and scheduling, which was mission-critical for the project's success. As a result of using STRUMIS and the team's hard work, the complex project was completed on time and within budget, a significant achievement celebrated by the project manager.


View this case study…

STRUMIS

51 Case Studies