Case Study: DPR Construction saves time and money with StructionSite

A StructionSite Case Study

Preview of the DPR Construction Case Study

Saving Time & Money Optimizing the schedule WORKFLOW METHOD Monica Chhatwani LEED AP BD+C In-wall QC workflow using StructionSite’s 360° photo documentation tool

DPR Construction used StructionSite’s 360° photo documentation tool on a large life sciences research building project in South San Francisco to improve its in-wall QC workflow. The team needed a more efficient way to capture conditions before, during, and after wall closures, track issues by room and floor, and reduce wasted field visits and information requests.

With StructionSite, DPR implemented a simple, repeatable workflow where QC foremen captured 360° images for each Takt area, linked non-conformance items to Autodesk BIM 360 Field Checklists, and documented progress through drywall completion. The result was stronger communication across trades, faster issue resolution, more efficient meetings, and a vendor-neutral turnover package, with more than 2,300 360° photos collected for the 300,000 sq. ft., 9-story building.


Open case study document...

DPR Construction

Monica Chhatwani

LEED AP BD +C


StructionSite

7 Case Studies