Case Study: Pepper Construction achieves faster jobsite productivity with StratusVue and KNAACK DataVault

A StratusVue Case Study

Preview of the Pepper Construction Group Case Study

Pepper Construction doubles jobsite productivity with StratusVue

Pepper Construction Group faced a mission-critical challenge to complete a data center project on an extremely fast-paced timeline. They needed a solution to streamline communications, improve jobsite efficiencies, and provide real-time access to live project data and Building Information Modeling (BIM) for their teams working on an active campus.

StratusVue, integrated with KNAACK's DataVault product, provided a cloud-based document management and digital plan storage solution directly on the jobsite. This allowed for real-time access to information, which doubled worksite productivity. The solution saved over 20 minutes per day in transit time per person by eliminating the need to walk back to a project trailer for plans and updates.